Clear Sky Resorts

Since 2020 SEAK has been working with the Clear Sky Resorts development team on planning, wastewater, and water distribution approvals for geodesic dome camps. The geodesic domes offer temperature controlled overnight lodging for travelers while providing over 75% open space on project sites. Projects vary from onsite source water development to municipal water connections. Some onsite wastewater treatment designs include future pool operations. Utah projects require level 3 onsite wastewater treatment licensure, annual inspections, and have been identified as suitable for ongoing experimental material design studies.





Let's Work Together

GET IN TOUCH